
Current locations:Index > Service > Attract Investment
Description of assets of Jianfeng thermal power plant
Release Time: 2018-10-13Jianfeng Thermal Power Plant (old plant) was first built in 2003, there are four high temperature and high pressure circulating fluidized bed boilers, due to the development needs of Baitao Chemical Park, in 2012, the construction of Baitao Chemical Park can be the company's heat island project, mainly responsible for the park's heating and power supply. Owing to the uneconomical operation of the old plant and the transfer of the original heating and power supply to the heat island plant, the Group decided to shut down all the old Jianfeng Thermal Power Plant (old plant) in February 2017.
In March 2003, the No. 1 and No. 2 boilers with 75T/h high temperature and pressure were built, and the No. 1 and No. 2 12 MW high temperature and high pressure single extraction condensing steam turbogenerator units were built. In March 2006, No. 3 130T / h boiler was built and put into operation, and No. 3 25MW high temperature and high pressure single extraction condensing turbine generator set was built. In July 2008, No. 4 140 T / h boiler was built and put into operation. Four sets of electrostatic precipitators and one set of ammonia desulfurization system were set up.
As of June 30, 2018, the original value of fixed assets of the old factory was 255912039.71 yuan, the net value of fixed assets was 186063429.39 yuan, of which the original value of housing was 41334703.70 yuan, the net value was 31091434.30 yuan; the original value of machinery and equipment was 176022753.72 yuan, the net value was 121558192.33 yuan; the original value of building assets was 38489095.29 yuan, and the net value was 31091434.30 yuan. The value is 31177167.13 yuan; the original value of other assets is 65487 yuan, and the net value is 22265.51 yuan.
Contact: Zheng Zhongyang, contact number: 13896769237
Previous:NO CONTENT